Sprint Enablement Sprint
Your system holds 117 research items — yet zero are eligible for current sprint planning because each is missing the required "sprint" attribute. The highest-scoring action (sprint_product_from_research, raw score 1.40) is permanently blocked. This sprint ends that gap — permanently.
$3,500 flat
Fixed price. Pay once. Receive all 5 deliverables.
Audit all 117 research records; extract existing attributes for sprint mapping
Develop and unit-test enrichment script; validate on 10% sample
Run full enrichment across all research items; generate validation report
Re-run sprint_product_from_research; confirm eligibility improvement; document outputs
Deliver all artefacts; implement ingest monitoring; provide runbook handoff
The enrichment script uses multi-signal inference combining project affiliation, creation timestamps, owner metadata, and topic clustering to infer the correct sprint identifier. Items with insufficient signals are flagged in the audit report for manual resolution — typically fewer than 10% of records.
Yes. The artefacts are system-agnostic. The enrichment script accepts JSON/CSV input and outputs standard structured formats. The ingest monitoring spec integrates via REST APIs or database hooks — adaptable to most research management platforms.
This sprint includes a fallback protocol: if enrichment alone doesn't achieve target eligibility, the validation report identifies secondary blockers (e.g., date range constraints, owner restrictions) and the enrichment script is extended to address them at no additional cost within the 5-day window.
You'll provide read access to the research records (via export, API, or database query) and write access for the enrichment script. No live system modification is required during development — the script runs against a working copy, with deployment coordinated on Day 5.